免费在线-99在线视频观看-欧美色图网站-国产女主播在线观看-一本到-色屁屁草草影院ccyycom-五月激情视频-亚洲天堂2015-天天色天天射天天干-国产三级伦理片-亚洲欧美强伦一区二区-一级黄色性片-hitomi超乳田中瞳在线播放-日本高清视频在线-国产精品日韩一区二区

Language:CHINESESENGLISH

Home > News > Talk about the matters needing attention in Dongguan steel structure welding
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

Talk about the matters needing attention in Dongguan steel structure welding

Time:[2021-12-15]  Hits:3105

The construction of the city is inseparable from the material of steel structure, which is particularly particular in welding, and there are also welding differences in design and process. Therefore, today we will talk about the matters needing attention in its welding from two aspects.

 

When welding on the former, pay attention to:

1. The position of weldments shall be arranged reasonably, and the weld shall be symmetrical to the central axis of the member section as far as possible.

2. The number of welds should be small and should not be too concentrated.

3. The weld size shall be appropriate, and the thickness of the weld shall not be increased at will.

4. Vertical crossing of two or three welds shall be avoided as far as possible, and shrinkage stress in the thickness direction of base metal shall be avoided as far as possible.

 

The following points shall be paid attention to when welding on the latter:

1. For small-size weldments, preheating before welding, tempering after welding, heating to about 600 degrees, and then cooling slowly can eliminate welding stress and welding deformation.

2. Reasonable welding sequence shall be adopted, such as sectional back welding, layered welding and diagonal skip welding of I-shaped section.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號