免费在线-99在线视频观看-欧美色图网站-国产女主播在线观看-一本到-色屁屁草草影院ccyycom-五月激情视频-亚洲天堂2015-天天色天天射天天干-国产三级伦理片-亚洲欧美强伦一区二区-一级黄色性片-hitomi超乳田中瞳在线播放-日本高清视频在线-国产精品日韩一区二区

Language:CHINESESENGLISH

Home > News > Installation point supported glass curtain wall supporting structural members shall comply with the requirements of
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

Installation point supported glass curtain wall supporting structural members shall comply with the requirements of

Time:[2014-6-18]  Hits:5341

Device point supported glass curtain wall supporting structural members shall comply with the following requirements:
1, Foshan steel device during system holes, assembly, welding and painting processes should comply with "steel construction and acceptance criteria" of the relevant provisions of GB50205;
2, a large steel structure should be hanging point plan and examination hanging;
3, steel unit in place, tighten the adjustment should be timely and reporting concealed work;
4, the steel components in the transport, storage and equipment damaged during coating and uncoated device convergence site,
5, must be applied to pre-tension the steel rod and steel cable devices. Optional pre-tension dynamometer measurement should be consistent with the planning requirements. Should set the pre-tension adjustment.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)