免费在线-99在线视频观看-欧美色图网站-国产女主播在线观看-一本到-色屁屁草草影院ccyycom-五月激情视频-亚洲天堂2015-天天色天天射天天干-国产三级伦理片-亚洲欧美强伦一区二区-一级黄色性片-hitomi超乳田中瞳在线播放-日本高清视频在线-国产精品日韩一区二区

Language:CHINESESENGLISH

Home > News > Steel and steel component assembly installation requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

Steel and steel component assembly installation requirements

Time:[2014-7-12]  Hits:6285

Steel and steel components assembled device requirements:
Foshan welded H-beam steel flange plates and webs seam seam spacing should not be less than 200mm.
Flange plate splice length should be less than 2 times the plate width. Web splice width should not be less than 300mm, the length should not be less than 600mm.
Cranes and crane girder truss system in place should not be under the scratch.
When multi-section column device, the positioning of the axis of each section of the column axis manipulation should lead directly on the ground, can not lead from the axis of the lower column, to avoid the formation of excessive accumulation errors.
After the completion of the steel truss structure and overall fight should leave after completion of the roof measuring its deflection, deflection and the measured value should not exceed 1.15 times the corresponding planning values.
Remember:
Paint, painting several times, coating thickness should fit planning requirements.
When planning for the coating thickness is not required, the total thickness of the coating: Outdoor should be 150μm, interior should be 125μm, the allowable deviation for each pass coating thickness of 25μm tolerance for 5μm..
Thin coating fireproof paint coating thickness should fit the planning requirements for fire resistance. Thick coating fireproof paint coating degrees, more than 80% of the area should be consistent with the relevant planning and fire resistance requirements, and should not be less than the thickness of the thinnest planning 85%.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號