免费在线-99在线视频观看-欧美色图网站-国产女主播在线观看-一本到-色屁屁草草影院ccyycom-五月激情视频-亚洲天堂2015-天天色天天射天天干-国产三级伦理片-亚洲欧美强伦一区二区-一级黄色性片-hitomi超乳田中瞳在线播放-日本高清视频在线-国产精品日韩一区二区

Language:CHINESESENGLISH

Home > News > Steel General Setup
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

Steel General Setup

Time:[2014-7-12]  Hits:5957

Steel usually means the program is:
Foshan Steel components View-based review beam steel columns supporting device device device platform plate (laminates, roof) device maintenance structure of the device.
For example:
- A multi-storey car factory paint shop program for the steel plant equipment:
View the basis of the review and the bottom component processing device between the steel columns supporting device main beam column secondary beam device device device cap plate steel roof purlins device device horizontal, vertical roof support device device device wall plates.
Another example:
- Bolt ball grid node device altitude bulk Act procedures:
Capitals elevation retest movable scaffolding platform erection drawings by planning to put line on the platform by means of ingredients to order six sets of rods mounted on the center line of the device grid transition plate, bearing device chord truss rod balls and equipment abdominal wound ball and rod means chord sequence to the first axis by axis grid cell to start the first device to complete the first ax
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號