免费在线-99在线视频观看-欧美色图网站-国产女主播在线观看-一本到-色屁屁草草影院ccyycom-五月激情视频-亚洲天堂2015-天天色天天射天天干-国产三级伦理片-亚洲欧美强伦一区二区-一级黄色性片-hitomi超乳田中瞳在线播放-日本高清视频在线-国产精品日韩一区二区

Language:CHINESESENGLISH

Home > News > Multi-storey and high-rise steel column base grouting requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

Multi-storey and high-rise steel column base grouting requirements

Time:[2014-8-27]  Hits:5519

Multi-storey and high-rise steel column base grouting requirements

[Student] multi doubt rise steel column base grouting and regulations?
[Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom end of the steel column column grouting, grouting way is to stand around in the column foot template, based on a clean surface to clear, and then polymerized with high strength mortar poured from the Liberal side to dense, after filling with wet straw bags or sacks conservation.
Above all finishing work according to the participants encountered in actual questions from, for reference, if in doubt please timely communication, correct me. Foshan Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號