Home > News > Guangzhou Steel Structure Installation general steps (more detailed)
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

Guangzhou Steel Structure Installation general steps (more detailed)

Time:[2016-4-6]  Hits:5258

Guangzhou Steel Structure Installation general steps (more detailed)

Guangzhou Steel installation general steps:
First, prepare the steel structure installation Guangzhou
(one). Ready to work
 1, the construction organization design and construction organization design of steel structure installation should provide a brief description of the project before, comprehensive statistical quantities, the correct choice of construction machinery and construction method, layout reasonable installation sequence, mainly installed elaborate technical measures, developed strict quality standards and safety installation standard, serious preparation of project schedules, workforce planning and materials supply plan.
 2. Check the pre-construction inspection of construction before the retest, including acceptance, construction equipment and measuring instruments and inspection of steel components based.
(1) Acceptance of Steel member steel members should be construction plans and specifications for acceptance. Steel member is transported to the site, the manufacturer shall provide factory certificate and the following technical documents:
 ① design and design modification documents;
 ② quality steel single or test report and supporting material;
 Test test data ③ high strength bolt friction coefficient;
 ④ plant one or two types of weld inspection reports;
 ⑤ steel members geometry inspection reports;
 ⑥ member list. Installation of this unit should be acceptance, and the actual condition of the structure retest. If the member is damaged in transit, require the production plant must be repaired.
(2) inspection before installation and construction equipment and measuring instruments for important hoisting machinery, tools, wire rope and other accessories shall be tested to ensure reliable performance have to ensure the smooth and safe installation. When installing the measuring instrument has to be regularly assigned to the National Bureau of Standards testing unit for testing, calibration, to ensure accuracy of the measurement standard.
 3, based retest. Steel is fixed in reinforced concrete base (base, capitals, corbels, etc.) on. Thus the base and anchor bolt accuracy, strength to retest. To retest the base level of the base surface elevation, roughness, horizontal position deviation anchors, anchor bolts embedded in the accuracy of the determination made. And the retest results and corrective require delivery of the base construction unit.
 4, preparation of installation plans and component supply plan, organize construction.
 5, check the steel components: Steel Factory member should have factory certification, drawings before installation press review enumeration member, the member is installed in accordance with the order arrived within the scope of the installation, without affecting the installation conditions as far as possible on the installation member lower position to ensure the installation convenience.
 6, installation of steel columns: first determine before lifting member hanging position to determine banding method, take appropriate precautions when lifting. After lifting steel columns when the column foot anchor bolt from about 30-40CM when righting the mounting bolt hole pedestal alignment, slow-fall in place. After the beginning of the school to be vertical deviation within 20MM, tighten the bolts temporarily fixed to decoupling.
 7, steel girder lifting: lifting steel beams after completion of the review column, lifting into place using two symmetrical banding installation hoisting steel beams. After lifting steel beams from the column reference plane 100MM slowly slowly in place, be adjusted to be corrected hoisting steel beams, then a fixed connection. With hanging with the theodolite corrected any time to correct deviations when hoisting steel beams.
 8, wall purlins installation: purlin cross-section smaller, lighter, and more using a hook or a hanging piece lifting method for lifting. Purlin correction is mainly the size and spacing of their own flatness. Check with the kind of pitch along the rod to move back and forth between the bar purlin members, subject to error, to relax or tighten the bolts corrected. Flatness ruler with cable and calibration checks, and finally bolted.
 9, the installation correction
 ①. Steel Column Correction: vertical steel columns correction theodolite or hanging wire hammer test, when the deviation is corrected using the jack, jack the base elevation correction a little elevation, and then increase or decrease the thickness of the plate, tightly immediately after the column foot correction is correct after solid anchor bolts, steel columns until the correct overall correction pouring fine stone concrete column under the soles of the feet fixed.
 ②. Steel Beam Correction: steel beams and vertical axis of the measurement correction, the correction performed using the jack, fixed immediately corrected.

 (two). Wall plate mounting pressure-type color
1. Preparation before construction
①, before the steel sheeting envelope construction and installation, custom corresponding construction drawings, and design and construction personnel training and production safety tests, according to the design documentation organization.
②, detailed check based on the file size and number of types of materials, damage to the pressure plate, flashing boards should be repaired and replaced.
③, various types of construction equipment should be complete, and can operate normally.
④, review and steel sheeting construction installation precision steel components relevant, clear coating installation weld spatter and purlins, and brushing the anti-rust paint for corrosion protection.
 2. Pressure-type color plate construction process: Siding installation by purlins from one location to start, must clenched between the board and the board, and then screws, drywall seams well water treatment. When the pressure plate is installed, it should be laid side edge to adjust its position, while fixed.
 (III). Floor bearing plate installation
 Before floor bearing plate construction, installation, drawing the appropriate row board diagram, according to the construction drawings. Pressure plate along one end of the floor to start laying, laying side edge to adjust its position, while fixed. Entrance case, install pressure plate, then cut the hole sizes according to the actual position of the hole.
 Second, the installation of steel Stability member monomer stabilization and structural overall stability
 1, the monomer component monomer stability stable member refers to a member at the site stack, from the pull, lifting, bending occurs in place during bending and torsion destruction and instability. Thus for thinner and larger member should consider this issue.
 2, the structure of the overall stability of the overall stability structure refers to the structure in the lifting process support system has not been formed, the structure must bear some of the load (including weight). Therefore, in the formulation of the lifting sequence must fully take into account this factor, to ensure that each step in the process of lifting the structure is stable. If the problem can be added other measures to resolve the temporary wind cable.
 Third, Guangzhou Steel installation and connection problems
 Live connection mainly ordinary steel bolts, high strength bolts connecting and welding.
 1, ordinary bolt connection, mainly used by ordinary bolt bending, pulling node. In the main bolt tension. Plus an appropriate prestressing, the shear structure are also used extensively for transmission towers and other connections. After ordinary bolt tightening, exposed threaded be not less than 2-3 button. Common locking bolt should measures, such as double-locking nuts or fastening nut. Bolt hole misalignment smaller reamer or rasp can be used to repair holes, gas cutting may not be used to repair holes.
 2, high-strength bolts, high strength bolts connecting ships directly for important structures to withstand dynamic loads in. Its main feature is to pass through the shear contact surface friction. Therefore, when high-strength bolts installed, practices and rough friction surfaces must be processed according to specifications. Secondly, also for the friction coefficient and torque coefficient test. When you install unscrew the torque to be measured at the beginning and end of the bolt screwing torque.
 3, site welding, site welding plant with welding inspection
 (1) the design of the site should be avoided in soldering
 (2) prevent the adverse weather conditions (rain, wind, cold climate) on construction
(3) reduce the adverse welding station (construction site operation can not rotate, only overhead welding, it is difficult to even settled welding personnel) influence in the process of lifting the steel should pay attention to the problem of the column, when the beam is installed, the main inspection horn column beneath the floor mat whether real, pad level, whether vertical column and the availability of displacement, the degree of vertical and lateral bending vector high primary and secondary beam. After the installation of steel structures formed spatially fixed unit and acceptance, it will require the construction unit in time and space column base plate top surface of the secondary concrete pouring compacting expansion. Finally, we need to check the verticality of the main steel structure and the whole plane bending

 Fourth, the preparation before lifting.
       When the manufacture of steel columns in the column axis design draw feet, on top of the cover shells on cross control lines, control and vertical axis of bolt installation quality control for lifting. Bolted steel construction for general use bolts and high-strength bolts. Ordinary bolts, each bolt end can not be more than two pads gaskets, not use gas cutting reamer bolt holes, bolts tightened after the exposed thread pitch of not less than 2; key control for high-strength bolts bolted rubbing treatment (sandblasted) , anti-slip surface friction coefficient, tightening sequences applied bolting, screwing early final twist, twist applied torque value, the value of the exposed threaded bolt, the gusset plate surface damage and deformation. Installation plate contact surfaces should be smooth, the contact surface must be greater than 75%, the edge of the gap is not greater than 0.8 mm, high-strength bolts should be free to penetrate not be beat and reaming; high-strength bolts shall not be used as a temporary installation bolt, bolt should one direction, bolt mounting every day should be a final twist is completed, a final twist after completion should be individually checked for less twist, super twist should be screwed up or replaced.
Steel Works important quality control points
Embedded quality embedded anchor bolts, anchor bolts directly affect the quality of the installation of steel structures, control bolt (group) position, squareness, length and elevation, and the reaming adjustment to reduce workload (even avoid rework), improve the structural quality of the installation is important. The method can be directly embedded anchor bolts embedded method may also be set aside hole method.
 Fifth, the steel works rainy winter construction measures
 (A) Construction in Winter
 1. Winter construction steel structure fabrication and installation of steel strictly enforced in accordance with the relevant provisions of Winter Construction.
 2. The steel components making positive temperature negative temperature installation should be considered when members shrinkage based on differences in ambient temperature, and adjust the deviation to take technical measures in construction.
 3. Participation negative temperature steel construction welders should be subject to a negative temperature welding technology training, examination, and obtain the corresponding certificate.
 4. The connecting material steel and related negative temperature used be accompanied by a certificate of quality, performance and product standards meet the design requirements.
 5. The negative electrode for use at a temperature more than two hours can not be exposed, more than two hours to re-baking electrode baking times no more than 3 times.
 6. flux prior to use in accordance with regulations baked to a moisture content of not more than 0.1%.
 7. The negative temperature high-strength bolts used shall have a product certificate, and at negative temperature coefficient of torque, axial force re-inspection.
 8. The negative temperature steel structure used coatings not use water-based paints.
 9. The next member feed, should be reserved for the shrinking margin, welding shrinkage and compressive deformation amount should be coordinated with the shrinkage of steel produced in the negative temperatures.
 10. member assembly, according to the order prescribed in the process from the inside out extended group fight, do weld shrinkage experimentally determined values ​​need to be reserved at the time of negative temperature group fight.
 11. component assembly, remove the seam 50mm memory remain rust, burrs, dirt, oil, snow and other debris, dry and free of residual moisture holding seams.
 12. The negative temperature should be at least 9mm steel plate welded to the multi-layer welding, weld surfacing from the bottom up layer by layer, each weld once finished welding, such as welding interruption before applying again to clear welding welding defects. Arc welding is prohibited on the base material.
 13. Steel-site installation, in case of snow or wind speed 6m / s or more, the erection of protective shed.
 14. eradicate substandard weld re-welding, steel welding process in accordance with the provisions under the negative temperature welding.
 15. When the ambient temperature is below 0 ℃, before brushing anticorrosive paint brushing process test, component surface rust, oil, burrs and other things necessary to clean up brushing clean, and keep the surface dry. Snow or ice may not work on brushing member.
 16. Winter transport, steel anti-slip measures taken when stacking, stacking space formation member firm no puddles, no freezing ground. When the same type of members are stacked, members should be kept level, horn on the same vertical line, and prevent slippery member.
 17. Installation according to claim former steel negative temperature conditions, their quality retest of the production and transportation of missed stacking member deformed, repair correction on the ground.
 18. Hoisting ropes should use anti-skid steel members plus septum, and at the same time lifting the gusset plate member, installers need to use the fixtures and other things with a rope lashing firmly.
 19. Preparation of steel components installation sequence chart according to the temperature conditions, in strict accordance with the provisions of the order will be installed during construction.
 20. Preparation installation of steel structures welding process, both ends of a member shall simultaneously be welded.
 twenty one. Before installing remove member surface ice, snow, dew, but not damage the coating.
 twenty two. Negative temperature installation of pillars, main beam immediately corrected permanently fixed position correction right now, the day of installation space member to form a stable system.
 23. The high strength bolt friction joint fitting member may not have snow ice surface, no contact with dirt, oil and other stolen goods.
 24. The negative temperature steel installation quality addition to complying with "Steel construction and acceptance norms" (GB50250-95) requirements, but also according to the design requirements for inspection and acceptance.
 (B) the rainy season construction measures
 1. Rain construction, erection of temporary protection should be shed, rain may not fall on a hot weld. The welding site is wet, wipe with a dry cloth and must be in before the welding with oxy-acetylene flame to dry, keeping the seams dry, no residual moisture.
 2. When lifting, the member if water should be cleaned before installation, but not damage the coating, high-strength bolts when fitting installation member friction surface should be clean, can not have drops, not rain and exposure to dirt and oil and other dirt.
 3. member rainy weather can not be brushing work.
 4. The rain and wind can not be more than five roof insulation construction.
 5. Because of the rain the air is moist, the electrode should be moisture storage and baked, repeat the same electrode baking times should not exceed twice by management in a timely manner grilled record.
 6. The case of windy weather, columns, beams, and other large supporting member should be corrected immediately, permanently fixed immediately after the position correction is correct, to prevent unilateral instability that day installation member, should form steric stabilization system.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
欧美成人精品一区二区男人看 | 久久综合久 | 欧美卡一卡二 | 日韩免费观看视频 | 又黄又爽的视频 | 亚洲第一色 | 国产精品亚洲精品 | 成人午夜又粗又硬又大 | 国产福利影院 | 国内精品久久久久 | 韩日av在线 | 特黄aaaaaaaaa毛片免费视频 | 日韩在线中文 | 久久a视频 | 日本福利网站 | 高清一区二区三区 | 伊人精品视频 | 亚洲福利片 | 中国一级特黄真人毛片免费观看 | 一区二区黄色 | 国产黄色一级片 | 按摩害羞主妇中文字幕 | 国产欧美精品 | 日韩欧美高清 | 成人免费在线播放 | 欧美成人一级 | 小视频免费观看 | 18岁免费观看电视连续剧 | 亚洲精品在线观看视频 | 久久久久久久亚洲 | 日本www视频| 91精品国产成人观看 | 国产一区二区三区四区在线观看 | 欧美成人影院 | 国产理论在线观看 | 午夜激情视频 | 在线免费观看视频 | 超碰在线观看免费 | 亚洲国产精品一区二区三区 | 无码人妻一区二区三区线 | 六十路息与子猛烈交尾 | 波多野结衣在线观看视频 | 成人免费毛片果冻 | 精品国产一区二区三区久久久蜜月 | 黄网站大全| 免费观看已满十八岁 | 日韩精品免费一区二区在线观看 | 性欧美丰满熟妇xxxx性久久久 | 日韩av在线不卡 | 亚洲色欧美 | www.天天操 | 久热免费视频 | 让男按摩师摸好爽视频 | 黄色裸体视频 | 无码少妇一区二区三区 | 久艹在线| 黄色天堂 | 欧美久久精品 | 91视频免费播放 | 丰满少妇一区二区 | 欧洲女性下面有没有毛发 | 一级在线观看 | 色人人| 色欲av无码一区二区三区 | 97人妻精品一区二区三区免 | 无码国产伦一区二区三区视频 | 一级久久| 欧亚乱熟女一区二区在线 | 91女人18毛片水多国产 | 黄色成人av | 女人床技48动态图 | 中文字幕第二页 | 亚洲综合图区 | 成人av观看 | 热久久免费视频 | 色姑娘综合 | 一级理论片 | 成人免费看片载 | 五月天激情电影 | 欧美性天天影院 | 日韩免费视频一区二区 | 波多野结衣网站 | 国产成人精品三级麻豆 | 麻豆电影网 | 暖暖爱免费观看高清在线遇见你 | 免费观看在线高清 | 人妻夜夜爽天天爽三区麻豆av网站 | 亚洲一区二区在线视频 | 狠狠干免费视频 | 一本色道久久综合熟妇 | 国产一区二区三区免费播放 | 成人在线一区二区 | 日韩视频一区二区 | 大地资源影视在线播放观看高清视频 | 久久99国产精品 | 成人无码视频 | 麻豆视频入口 | 亚洲综合五月天婷婷丁香 | 一区二区三区四区五区 | 日韩二三区 | 四虎影院在线播放 | 精品网站999www| 久久影院午夜理论片无码 | 天堂中文在线观看 | 91看片免费版 | 久草免费在线观看 | 久久av红桃一区二区小说 | 蜜臀99久久精品久久久久久软件 | 成人午夜影院 | 亚洲卡一卡二 | 麻豆网站在线观看 | 国产91在线播放 | 夜夜撸| 六十路息与子猛烈交尾 | 国产91白丝在一线播放 | 精东影业一区二区三区 | 超碰网址 | 91视频一区二区 | 电车里的日日夜夜 | 在线免费观看av网站 | 中文字幕av一区 | 日本人做爰全过程 | 国产伦精品 | 蜜桃视频一区二区 | 日韩成人免费视频 | 在线中文字幕视频 | 天天想你在线观看完整版高清 | 羞羞网站在线观看 | 国产色在线| 91精品国产成人观看 | 超碰在线91| 亚洲午夜精品久久久久久app | 亚洲熟女乱色综合亚洲av | 七七88色 | 亚洲男人天堂 | 黄色在线观看网站 | 72种无遮挡啪啪的姿势 | 亚洲国产精品自拍 | 精品一区二区三区四区 | 欧美激情中文字幕 | 欧美日韩黄色 | 无码人妻久久一区二区三区蜜桃 | 成人精品视频在线观看 | 一吻定情2013日剧 | 国产精品毛片久久久久久久 | 亚洲自拍偷拍视频 | 在线观看中文字幕 | 一本色道久久综合亚洲精品按摩 | 国产在线麻豆精品观看 | 国产另类视频 | 成年人免费在线观看 | 美女免费网站 | 亚洲色图一区二区 | 中国免费看的片 | 无码人妻精品一区二区三 | 黄色综合| 久久久久久精 | 国产午夜精品一区二区 | 国产精成人品 | 少妇一级淫片免费放 | 男人的天堂亚洲 | 日韩在线成人 | 意大利少妇愉情理伦片 | 日本三级吃奶头添泬无码苍井空 | 日韩电影网站 | 97视频免费在线观看 | 免费观看在线观看 | 亚洲熟妇av乱码在线观看 | 黄页在线观看 | 粗大的内捧猛烈进出 | 黄网站免费看 | 在线观看特色大片免费网站 | 国产成人精品三级麻豆 | 午夜精品久久久久久久久久久久 | 国产1区 | av一级片| 少妇又紧又色又爽又刺激视频 | 性色网站| 天天天操| 天天操夜夜撸 | 少妇在线观看 | 免费看一级片 | 91成人在线观看国产 | 女人性做爰24姿势视频 | 成人黄色网 | 骚虎视频在线观看 | 中文字幕永久在线 | 国产视频久久久 | 91少妇丨porny丨 | 久草免费福利视频 | 日本一级视频 | 日本黄色免费网站 | 今天高清视频在线观看 | 亚洲色综合 | 国产成人av在线播放 | 91香蕉国产在线观看软件 | 超碰人人艹 | 麻豆免费版 | 日韩免费在线观看视频 | 亚洲春色一区二区三区 | 老司机福利在线观看 | 午夜免费网站 | 中文字幕www | 在线一区 | 日本不卡在线 | 美女视频一区 | 国产最新av | 蜜臀av在线观看 | 国产精品一区二区在线 | 免费看片成人 | 欧美成人激情视频 | 亚洲国产天堂 | 日本免费一区二区三区 | 亚洲自拍偷拍视频 | 无码人妻一区二区三区线 | 波多野结衣一区 | 久草精品视频 | 亚洲精品字幕在线观看 | 91亚色 | 国产天天操 | ass亚洲肉体欣赏pics | 美女破处视频 | 西西人体大胆4444ww张筱雨 | 国产精品美女视频 | 久免费一级suv好看的国产 | 樱花影院电视剧免费 | 欧美做受高潮1 | 日韩一二区 | 久久久影视 | 日日夜夜精品视频 | 日韩黄色在线观看 | 中文字幕日韩在线观看 | 亚洲中出 | gogogogo高清免费完整版视频 | 在线观看特色大片免费网站 | 日本不卡一区二区三区 | 日韩在线视频播放 | 少妇精品 | 一区二区免费在线观看 | 无码精品人妻一区二区三区漫画 | 亚洲国产成人精品女人久久久 | 国内自拍视频在线观看 | 国产在线视频一区二区 | 亚洲第四页 | 亚洲爆乳无码一区二区三区 | 精产国品一区二区三区 | 久久久噜噜噜久久中文字幕色伊伊 | 国产人妻精品午夜福利免费 | 久草精品视频 | 黑帮大佬和我的三百六十五天 | 蜜桃av鲁一鲁一鲁一鲁俄罗斯的 | 91精选 | 自拍偷拍一区二区三区 | 小视频在线观看 | 日韩视频免费 | 黄色在线观看网站 | 欧美一级黄色片 | 无码人妻aⅴ一区二区三区玉蒲团 | 久久噜| 97香蕉碰碰人妻国产欧美 | 黄瓜视频在线免费观看 | 波多野结衣一二三区 | 国产黄在线观看 | 欧美精品久久久久久 | 午夜高清 | 免费看大片a| 伊人导航 | 欧美性xxxx| 高中男男gay互囗交观看 | 欧美中出 | 国产精品一二三区 | 国精产品乱码一区一区三区四区 | 欧美丰满老熟妇aaaa片 | 欧美精品久久久久 | 九九热国产 | 天堂中文字幕 | 日韩伦理视频 | 强伦轩人妻一区二区电影 | 中文字幕影院 | 亚洲激情影院 | 日韩视频在线观看 | 男女激情大尺度做爰视频 | 欧美日韩国产高清 | 亚洲久草| 中文字幕在线观看免费 | 波多野结衣在线看 | 捆绑少妇玩各种sm调教 | 大地资源二中文在线影视观看 | 久草久草 | 亚洲欧美色图 | 熟妇女人妻丰满少妇中文字幕 | 欧美不卡一区二区三区 | 黄色高清网站 | 久久久久久久久久久久久久久久久 | 日韩精品免费在线观看 | 日日夜夜免费视频 | 亚洲精品中文字幕在线观看 | 在线中文字幕网站 | 日本中文字幕在线视频 | 亚洲精品中文字幕在线观看 | 欧美成人小视频 | 香蕉视频网址 | 中文字幕一区二区三区四区五区 | 日日视频 | 肥婆大荫蒂欧美另类 | 在线免费看黄 | 永久免费av | 欧美1区2区| 蜜臀av在线播放 | 伊人导航 | 大地资源二中文在线影视观看 | 国产无精乱码一区二区三区 | 成人理论片 | 成人91视频| av在线资源 | 亚洲精品三区 | 人人干视频 | www.日韩在线 | 久久久999| 91成人在线观看喷潮蘑菇 | 91成人在线观看喷潮蘑菇 | 二区三区 | 色狠狠av | 久草视频免费看 | 好爽…又高潮了毛片免费看 | zzjizzji亚洲日本少妇 | 亚洲视频在线观看 | 久久日韩 | 香蕉视频免费在线观看 | 狠狠干天天操 | 久久精品久久精品 | 草莓视频在线观看污 | 亚洲小视频 | 国产精品久久久久久久9999 | 在线伊人 | 日韩欧美精品一区 | 久热伊人 | av免费网址 | 中文字幕丝袜 | 特级淫片aaaaaaa级 | 怡红院亚洲 | 五十路japanese55丰满 | 日本一区二区三区在线播放 | 欧美在线|