免费在线-99在线视频观看-欧美色图网站-国产女主播在线观看-一本到-色屁屁草草影院ccyycom-五月激情视频-亚洲天堂2015-天天色天天射天天干-国产三级伦理片-亚洲欧美强伦一区二区-一级黄色性片-hitomi超乳田中瞳在线播放-日本高清视频在线-国产精品日韩一区二区

Language:CHINESESENGLISH

Home > News > After the completion of the steel structure how to carry out inspection work
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hengfeng-tools.com

After the completion of the steel structure how to carry out inspection work

Time:[2016-10-24]  Hits:5181

    After the completion of the steel structure, then we must carry out inspection work, and we should do to ensure the integrity of the acceptance work? The following steel companies in Shenzhen to do simple to share:
       1, to ensure that the project is to ensure the safety of the project or use an important inspection items. Regardless of the quality rating of qualified or excellent, must all meet the requirements of the required indicators. For different sub-projects, to ensure that the content of the project to ensure that the project only to meet, no fine, qualified points.
        2, the basic project is to ensure the safety of the project or the use of the basic functions of the test items, the indicators points "qualified" and "good" two, is to assess the quality of sub-project an important condition.
        3, to allow the deviation of the project is a sub-project inspection of the provisions of the scope of the project allows the deviation. Inspection and assessment of a small number of points allowed to measure the value of slightly more than the allowable deviation range.
         The above is the summary of the completion of the steel structure of the acceptance of work, if you want to know more or want to purchase, please call!
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號